DESIGN AND CONSTRUCTION OF THE CENTRAL STERILIZATION DEPARTMENT OF VINNYTSIA REGIONAL HOSPITAL NAMED AFTER M.I. PIROGOV
  • /
  • /
RESULT OF WORK
Proper development of architectural and planning solutions and engineering systems of a Central Sterilization Department of a healthcare facility is one of the most important tasks when it comes to infection control in a healthcare facility, not without reason this department is called "a heart of the whole hospital".
Construction of the Central Sterilization Department of Vinnytsia Regional Hospital named after M.I. Pirogov was implemented by the MBPG team on a turnkey basis – from design work, which included the development of architectural and planning solutions, ventilation and air conditioning systems, utilities, water treatment systems,
calculation of production capacity – to construction work, installation of equipment, pre-commissioning and commissioning, with the appropriate staff training.

Getinge AB technological equipment, Vents ventilation systems, C&H and
Carel air conditioning systems, BWT water treatment systems.

Implementation period – 1 year, the project was completed in 2020.